Thursday, March 10, 2016
Mopa's Environment
Wednesday, November 18, 2015
India's failed airports
Wednesday, October 28, 2015
Updates on the Navy and Dabolim
1. Anyone who's been to Dabolim recently would have noticed that at peak times, there is a shortage of apron space for airplane parking. There is also a desperate need for a taxiway on the terminal side (north) of the runway. This article talks about additional airside land being made available for apron and airplane parking.
Dabolim is closed for civilian traffic from 8:30am - 1pm on weekdays (not weekends!). The article also points out that Lohegaon in Pune, with 3 air force squadrons, permits 24 hour civilian operations. So does INS Dega / Vishakapatnam, the Navy's main air base on the East Coast.
2. This recent article has one squadron of MIG29Ks being repositioned at Vishakapatnam / INS Dega. It also talks about quite a few advanced jet trainers being positioned at INS Dega, and INS Dega becoming nearly as large as INS Hansa / Dabolim. INS Dega / Vishakapatnam permits 24 hour civilian operations.
3. The new maritime reconnaisance aircraft, Boeing P8-i are all based at INS Rajali, Arakkonam, Tamil Nadu.
There are 2 naval bases being created / upgraded around Dabolim - Belgaum and Karwar.This raises the question why 24 hour civilian operations cannot be permitted in Dabolim.
That would obviously kill Mopa. Perhaps that is the answer
(Article updated on 14-Nov-2015 with the 3rd point. Also, it no longer is clear whether the defense are building an air strip at Naqueri-Betul for the Defexpo)
Thursday, June 13, 2013
Hope is not a strategy : The demand for Mopa
The ICAO Report in 2007 was commissioned by the Goa Government. ICAO was asked to examine the possibility of operating both Mopa and Dabolim. The ICAO Report concluded that air traffic of 28 million per year would be the minimum needed to make this strategy economically viable. Goa's traffic is currently only 3.5 million. Mopa comes online in 2016-17. Where will this incredible increase come from ?
As this article goes on to show, there are no real executable plans in place. The Regional Plan 2021 has nothing that supports such an increase. The Goa Vision 2035 is only a vision, possibly more a mirage. The Tourism Master Plan is still in development. The Goa Investment & Industrial Policy 2013, which is expected shortly, is also not a strategy or a plan of execution. We are lead to the inevitable conclusion that the proposal for Mopa is a castle in the sky - with foundations of hot air.
Given that a very substantial part of the resources of Goa will be poured into Mopa, this is a very worrisome situation. And we have numerous recent examples of failed greenfield airports from around the world to give us pause for consideration.
Friday, May 31, 2013
AAI information
I also sent some questions. The responses are below. The traffic forecasts (I have added the actuals) can be viewed here. It is worth noting that the 2045-46 forecast shows Goa's traffic above the current traffic at Delhi, India's busiest airport. The forecast works out to around 1,00,000 passengers a day (compared to Goa's population of 15,00,000)! The serious reader would find IMG document useful.
Wednesday, April 24, 2013
Mopa and Dabolim - After the ICAO 2007 Report
- The possible constraints on capacity at Dabolim, especially in comparison with Gatwick Airport, which services nearly 35mn passengers with a single runway. It turns out that constraints at Dabolim, if any, are surrounding the availability of land for larger terminals, aircraft stands, and other items like car parking and fuel tanking.
- It showed that there is a massive increase in the number of airports in our vicinity that will soon be able to handle A-320s/B737s.
- It looked at the alternatives facing Goa. The two airport option is the worst of all worlds. If we put Dabolim head to head with Mopa, Mopa is clearly inferior to Dabolim on many counts. Only if there is an overriding hard constraint on expansion at Dabolim should Mopa even be considered.
- A look at the map showed that there are significant parcels of land available in and around Dabolim for the Navy to move its non-critical infrastructure (housing, etc.), and for the Civil Enclave to expand. There is substantial land available for any food processing park that is being bandied about.
- Lastly, it speculates about why the state of Goa has got stuck with a second airport, which has not been justified in any rigorous fashion.
Thursday, April 18, 2013
Dabolim air traffic monthly data since April 2006
Some takeaways for Goa :
- The peak traffic of 13,688 passengers seen in Jan 2013 is equivalent to only around 5 hours of peak traffic for the new terminal. Therefore, we can reasonably expect the new terminal to handle a doubling of air traffic at Dabolim - 8 hours of peak traffic and the rest spread through off-peak times. Remember, the ICAO Report stated that neither the runway nor the cargo load projections acts as any constraint on capacity at Dabolim.
- Domestic traffic is an increasingly important part of the overall traffic. Projections that Mopa will see extraordinary international traffic isn't borne out by the data.
- Domestic traffic is much smoother - it doesn't dip very much in the monsoons. This is not the case for international traffic, and represents a missed opportunity for Goa tourism.
- Passengers per flight (movement) is much more variable for the international traffic. Presumably, this reflects the fact that 747s are used only for the tourist season.
- International cargo shows a correlation with the tourism season, indicating that charters are taking on cargo also.
Please put any requests for additional analysis or charts, or observations on the data in the comments below.
Update : Spreadsheet updated till March 2013.
Update 18-Nov-2014 : Spreadsheet updated till September 2014.
Friday, April 12, 2013
Key paras from ICAO 2007 Report
The ICAO Report in 2007 can be downloaded here. If anyone has the Reports by ADPi, GTA/Vienna reports, Louis Berger or Ammann & Whitney , please contact me. Likewise, if there's any knowledge of a master plan for Dabolim / studies by AAI on either Mopa or Dabolim.
There are a number of interesting paras from the ICAO report that I quote below (selection mine, all favouring the continuation of Dabolim and not creating Mopa).
Note the objective of the 2007 ICAO report is to examine the feasibility of multi-airport strategy.
"Before proceeding further with the construction of a new airport at Mopa, the Government of Goa decided to study the feasibility of simultaneous operations at Dabolim and Mopa airports and requested ICAO to undertake the study."
Note that a key assumption around Dabolim is that there would be no further development ! And that the Government of Goa has decided to go ahead with Mopa, so no review of that decision.
"The study will be based on the following assumptions:
- Dabolim airport will continue to exist in the foreseeable future as a naval airport and that beyond the currently planned developments for civilian use, for which 6 acres of land are to be released by the Ministry of Defence; there will be no further substantial development for civilian traffic in the foreseeable future. This limited scope study is not intended to be a techno-economic feasibility study for the development of Dabolim airport to continue to serve as the sole airport for Goa for civilian operations.
- A decision in principle has been taken by the Government of Goa to construct a greenfield airport at Mopa site."
From the one line conclusion, it is clear that IF additional land is made available to AAI at Dabolim, Mopa will never be required.
"There is no question that a new airport will eventually be required at Mopa, when the enhanced capacity of Dabolim will not cope with the demand. The challenge is to determine when this capacity will be reached, assuming no additional land will be made available to AAI, and therefore, when the new airport should be commissioned, with what airport characteristics and with what capacity."
Friday, February 8, 2013
Dabolim and Mopa
- Dabolim Airport will be saturated at 3 million passengers a year. We will soon have 6 million passengers a year. Wide bodied aircraft cannot land at Dabolim.
- It is better to have a second airport. Regional Airports are doing well. It reduces travel distances.
- We can create an export hub at the airport. We can also create a food processing area.
- The Mopa land anyway has a bauxite mining lease on it. It is preferable to build an airport instead.
As I will show below, these are bogus. A Government serious about Goa and what can be implemented would spend its time on Dabolim and not acquire vast tracts of land needlessly for a second airport.